PRODUCTS CENTER
With a total construction area of 85,000 square meters, it is scheduled to be put into use in June 2018
Wrestling stadium for Senegal
The starting point of the project is located at the Piedmont Interchange of the north extension line of the Airport Expressway, and the end point is located at the Olympic Sports Interchange of the Ring Highway. The route length is 46.646Km. The project is roughly bounded by the North Second Ring Highway and divided into the north section and the south section.